Unit 3 Kakinada commenced commercial operations Jan 2025 A section of Phase 1 of the new greenfield Unit 3 manufacturing facility at Kakinada, Andhra Pradesh commenced commercial operations from January 1, 2025. Information related to the new unit is included in the BRSR reporting effective from that date, expanding the reporting boundary.
▾ expand
SBTi commitment for near-term and net-zero targets The Company has committed to the Science Based Targets initiative (SBTi) for both Near term and Net-Zero targets. Targets are being developed; GHG footprint verified externally per ISO 14064-1 annually.
▾ expand
Reports alignment with SDGs 3, 6, 7, 8, 9, 12, 13, 14, 15 The Company reports impact across Sustainable Development Goals 3 (Health), 6 (Clean Water), 7 (Affordable & Clean Energy), 8 (Decent Work), 9 (Industry & Innovation), 12 (Responsible Consumption), 13 (Climate Action), 14 (Life Below Water), and 15 (Life on Land).
▾ expand
ISO 45001 & ISO 14001 certified EHS management system certified under ISO 45001 (Occupational Health & Safety) and ISO 14001 (Environmental Management). Also ISO 9001 quality systems.
▾ expand
Project Jalaprasadam - 112 RO plants prevent ~5,200 MT plastic waste/year Installed 112 RO water plants across temple premises providing 2,76,793 litres of clean water daily, equivalent to avoiding 2,76,793 PET bottles/day. Prevents ~5,200 MT plastic waste/year and ~22,500 MT CO2 emissions.
▾ expand
Limited on-site solar/transparent roofing; reliance on grid + boiler fuel Divi's reports ~23,267 GJ renewable electricity in FY2024-25 (up from 7,441 GJ in FY2023-24), representing <0.5% of total energy consumption. Initiatives are modest: replacing electrical garden lights with solar lights and arranging transparent roof-top sheets at manufacturing facilities. The 2030 goal is to 'rely on renewable energy sources to the extent possible, where applicable' - notably without a specific renewable percentage target. The vast majority of energy remains non-renewable (49,38,860 GJ of 49,62,127 GJ total).
▾ expand
Primary: Compressor and air dryer unit upgrades Replaced screw-type air compressors with centrifugal variants and conventional purge-type Air Dryer Units (ADUs) with Heat of Compression (HOC) ADUs, reducing emissions by ~3,170 TCO2e and contributing energy savings of ~16,090 GJ during FY2024-25.
▾ expand
Primary: Steam condensate recovery and reuse Recovered and reused steam condensate water in boiler operations, resulting in ~280 TCO2e reduction and conserving ~11,970 KL of water. Replaced steam ejectors with dry vacuum pumps, leading to a reduction of ~380 TCO2e.
▾ expand
Dependent: Sustainable procurement engagement with suppliers About 65.16% of purchases by value are sourced from vendors who embraced the Company's sustainable procurement policy. Assessment of value chain partners on health & safety, working conditions, and environmental impacts has commenced. Divi's encourages suppliers to adopt practices that minimise environmental impact across their supply chains.
▾ expand
Sustainability Goals 2030 (base year FY2019-20) Targets vs 2019-20 baseline: reduce absolute Scope 1+2 GHG by 5%; reduce intensity-based Scope 1+2 GHG by 25%; reduce intensity-based energy consumption by 25%; reduce groundwater & surface water intake by 30%; reduce water consumption by 25%; reduce intensity-based waste disposal by 25%; reduce plastic packaging waste.
▾ expand
see 8 more events →