RVBA-TETRAListed

Tetra Tech

Architecture & Engineering·Engineering & Construction
TTEK (NASDAQ)·Pasadena·US
Verified credentials
SBTi Validated1.5°CCDP Listed
Company website
no trajectory chart yet — needs at least one percent-reduction target with matching scope data

Headline intensities

·Values in USD ($)
Peer cohort: Architecture & Engineering · lower is better
Revenue intensity
Carbon / $m revenue
tCO2e / $m revenue

Carbon per million dollars of revenue. The legacy industry-standard reference (CDP, MSCI). Useful for cross-sector context, but distorted by margin — high-margin firms appear artificially efficient. Read alongside the operational and asset intensities for the full picture.

Operational intensity
Carbon / $m OpEx
tCO2e / $m OpEx

OpEx (operating expenditure) is the running cost of the business — staff, services, energy, materials. This shows how carbon-intensive operations are per million dollars of spend. Removes the margin distortion that revenue-based ratios introduce.

Economic intensity
Carbon / $m EVIC
tCO2e / $m EVIC

EVIC (Enterprise Value Including Cash) is the firm's total capital footprint — equity + debt + cash + minority interest. The EU's standard intensity measure (SFDR PAI 3) — answers: how much carbon does each million of capital deployed in this business produce?

Asset intensity
Carbon / $m PP&E + leased
tCO2e / $m PP&E

PP&E (Property, Plant & Equipment) plus leased real-estate assets is the firm's physical infrastructure on the balance sheet. This shows the carbon intensity of that physical footprint — uses Scope 1+2+3 for consistency with the other headline intensities. Surfaces stranded-asset risk for asset-heavy firms.

Workforce intensity
Carbon / FTE
tCO2e / FTE

Carbon per FTE (full-time-equivalent employee) — the diagnostic measure for people-leveraged businesses where headcount, not capital, drives delivery. Captures the office, energy and travel footprint per person.

Targets

Near-term

3 targets
ScopeBaseTargetReductionAlignmentProgressStatus
Scope 1 + 2Absolute20212030−50%1.5°Cinsufficient data
Scope 320212027−60%insufficient data
Scope 3Absolute20212030−50%insufficient data

Latest reporting year· 6 earlier years on Data-by-year tab

all years + ratios →

2026

reporting year
Financials
Revenue
OpEx
FTE
Market cap (FY-end)
Climate
Scope 1
Scope 2 (market)
Scope 2 (location)
Scope 3 total