Nabha · Physical exposureFACILITY
GSK · manufacturing · Nabha, IN · 30.374, 76.153
basis:
MEASURED · confidence: 0.65 · status: activeCombined risk & exposure
Radial: current state · Sparklines: 2023 / 30 / 50 / 80Trajectory across horizons
Water stress5.00 → 5.00
Aqueduct 4.0 BWS score at the HydroBASINS L6 watershed containing the site.
Water depletion5.00 → 5.00
Aqueduct 4.0 BWD score — cumulative extraction against replenishment at the same watershed.
Deforestation5 ha cumulative → extrapolated +0 ha
Hansen Global Forest Change tree-cover loss within 5km; forward horizons extrapolated from 2019-2023 loss rate.
Grid carbon670 gCO₂/kWh → 250 gCO₂/kWh
Ember observed gCO₂/kWh for the country; IEA STEPS for 2030 / 2050 projection.
P1
Physical climate
Current state + 2030 / 2050 / 2080 horizons (NEX-GDDP, Aqueduct Future, CoastalDEM, UKCP18)
Business as usual
| Indicator | 2030 | 2050 | 2080 |
|---|---|---|---|
| Water stress (0–5) | 5.0 | 5.0 | 5.0 |
| Water depletion (0–5) | 5.0 | 5.0 | 5.0 |
| Interannual variability (0–5) | 3.7 | 3.3 | 2.5 |
| Seasonal variability (0–5) | 2.7 | 2.7 | 2.9 |
Pessimistic
| Indicator | 2030 | 2050 | 2080 |
|---|---|---|---|
| Water stress (0–5) | 5.0 | 5.0 | 5.0 |
| Water depletion (0–5) | 5.0 | 5.0 | 5.0 |
| Interannual variability (0–5) | 3.5 | 2.8 | 3.0 |
| Seasonal variability (0–5) | 2.7 | 2.9 | 3.0 |
P2
Nature dependency
Water (Aqueduct + sector-weighted lens), biodiversity, soil
Water — sector-weighted lens
3.59 High (office lens)
Watershed: Punjab, India · aq30 36512
Hydrology context
Major basin: Arabian Sea (ex 296) · coastal
Water — Aqueduct baseline indicators
BWS — Water stress
5.00
Extremely High (>80%)
BWD — Depletion
5.00
Extremely High (>75%)
RFR — Riverine flood
3.25
High (6 in 1,000 to 1 in 100)
CFR — Coastal flood
0.00
No Risk
DRR — Drought
4.35
High (0.8-1.0)
UDW — Drinking water
2.90
USA — Sanitation
5.00
Biodiversity — protected areas
No protected areas within 30km (currently PAD-US US-only; KBA + national PAs Wave 2 pending).
Soil
SoilGrids / Living England — Wave 3/5 pending
P3
Nature impact
Emissions, fire, deforestation
Fire (FIRMS, last 7 days)
145 fires within 50km · nearest 2.8 km
Air quality (PM2.5)
Nearest station Model Town, Patiala - PPCB (20.7 km) — no recent PM2.5 measurement.
Asset emissions (Climate TRACE, within 50km)
1 asset · 0 ktCO₂e/yr aggregate
- Jalkheri Biomass power station — electricity-generation/ · 0 ktCO₂e (2024) · 21.4 km
Deforestation (Hansen GFC, 5km buffer)
Loss 2001-2023 within 5km
5.00
hectares
Loss 2019-2023 (recent)
0.00
hectares
Canopy cover (2000 baseline)
0.73
% in 1km
P4
Operational + social
Buildings, grid carbon, workforce
Buildings
Microsoft + Google footprints + EPC — Wave 3 pending
Grid carbon intensity
2025 · now
670.13
gCO₂/kWh
2030 · STEPS
520
gCO₂/kWh-22%
2050 · STEPS
250
gCO₂/kWh-63%
Country lookup (IN) · Ember 2024 + IEA WEO 2024 STEPS
Workforce
ONS / BLS just-transition — Wave 6 pending
P5
Disclosure-ready outputs
TNFD-LEAP / IFRS-S2 / SBTN / EUDR / BNG / SBTi-FLAG fragments
Applicable frameworks
TCFD, IFRS-S2, CSRD, EU ETS, EU eMARS
wave_5_pending — composed from bakes once P1-P4 populated
Generated 2026-07-08T00:41:07.536Z