Nashik · Physical exposureFACILITY
GSK · manufacturing · Nashik, IN · 20.011, 73.790
basis:
MEASURED · confidence: 0.65 · status: activeCombined risk & exposure
Radial: current state · Sparklines: 2023 / 30 / 50 / 80Trajectory across horizons
Water stress5.00 → 5.00
Aqueduct 4.0 BWS score at the HydroBASINS L6 watershed containing the site.
Water depletion3.55 → 3.52
Aqueduct 4.0 BWD score — cumulative extraction against replenishment at the same watershed.
Deforestation0 ha cumulative → extrapolated +0 ha
Hansen Global Forest Change tree-cover loss within 5km; forward horizons extrapolated from 2019-2023 loss rate.
Grid carbon670 gCO₂/kWh → 250 gCO₂/kWh
Ember observed gCO₂/kWh for the country; IEA STEPS for 2030 / 2050 projection.
P1
Physical climate
Current state + 2030 / 2050 / 2080 horizons (NEX-GDDP, Aqueduct Future, CoastalDEM, UKCP18)
Business as usual
| Indicator | 2030 | 2050 | 2080 |
|---|---|---|---|
| Water stress (0–5) | 5.0 | 5.0 | 5.0 |
| Water depletion (0–5) | 3.2 | 3.5 | 3.5 |
| Interannual variability (0–5) | 3.3 | 4.0 | 3.7 |
| Seasonal variability (0–5) | 2.8 | 2.5 | 2.5 |
Pessimistic
| Indicator | 2030 | 2050 | 2080 |
|---|---|---|---|
| Water stress (0–5) | 5.0 | 5.0 | 5.0 |
| Water depletion (0–5) | 3.3 | 3.4 | 3.5 |
| Interannual variability (0–5) | 3.0 | 2.9 | 3.4 |
| Seasonal variability (0–5) | 2.7 | 2.8 | 2.8 |
P2
Nature dependency
Water (Aqueduct + sector-weighted lens), biodiversity, soil
Water — sector-weighted lens
3.47 High (office lens)
Watershed: Maharashtra, India · aq30 35925
Hydrology context
Major basin: GODAVARI · coastal
Water — Aqueduct baseline indicators
BWS — Water stress
5.00
Extremely High (>80%)
BWD — Depletion
3.55
High (50-75%)
RFR — Riverine flood
2.29
Medium - High (2 in 1,000 to 6 in 1,000)
CFR — Coastal flood
0.00
No Risk
DRR — Drought
4.24
High (0.8-1.0)
UDW — Drinking water
2.89
USA — Sanitation
5.00
Biodiversity — protected areas
No protected areas within 30km (currently PAD-US US-only; KBA + national PAs Wave 2 pending).
Soil
SoilGrids / Living England — Wave 3/5 pending
P3
Nature impact
Emissions, fire, deforestation
Fire (FIRMS, last 7 days)
14 fires within 50km · nearest 11.5 km
Air quality (PM2.5)
20.2µg/m³ · Moderate
From OpenAQ station Gangapur Road, Nashik - MPCB · 1.5 km away · measured 5/19/2026
Asset emissions (Climate TRACE, within 50km)
1 asset · 2,602.2 ktCO₂e/yr aggregate
- Nasik MAHAGENCO Thermal Power Station — electricity-generation/ · 2,602.2 ktCO₂e (2024) · 11.2 km
Deforestation (Hansen GFC, 5km buffer)
Loss 2001-2023 within 5km
0.10
hectares
Loss 2019-2023 (recent)
0.00
hectares
Canopy cover (2000 baseline)
0.06
% in 1km
P4
Operational + social
Buildings, grid carbon, workforce
Buildings
Microsoft + Google footprints + EPC — Wave 3 pending
Grid carbon intensity
2025 · now
670.13
gCO₂/kWh
2030 · STEPS
520
gCO₂/kWh-22%
2050 · STEPS
250
gCO₂/kWh-63%
Country lookup (IN) · Ember 2024 + IEA WEO 2024 STEPS
Workforce
ONS / BLS just-transition — Wave 6 pending
P5
Disclosure-ready outputs
TNFD-LEAP / IFRS-S2 / SBTN / EUDR / BNG / SBTi-FLAG fragments
Applicable frameworks
TCFD, IFRS-S2, CSRD, EU ETS, EU eMARS
wave_5_pending — composed from bakes once P1-P4 populated