Emirates Precast Construction LLC facility - Jebel Ali Industrial Area 2, Dubai · Physical exposureFACILITY
Laing O'Rourke Delivery Limited · manufacturing · Dubai, AE · 25.074, 55.189
basis:
MEASURED · confidence: 0.65 · status: activeCombined risk & exposure
Radial: current state · Sparklines: 2023 / 30 / 50 / 80Trajectory across horizons
Water stress5.00 → 5.00
Aqueduct 4.0 BWS score at the HydroBASINS L6 watershed containing the site.
Water depletion5.00 → 5.00
Aqueduct 4.0 BWD score — cumulative extraction against replenishment at the same watershed.
Deforestation1 ha cumulative → extrapolated +14 ha
Hansen Global Forest Change tree-cover loss within 5km; forward horizons extrapolated from 2019-2023 loss rate.
Grid carbon466 gCO₂/kWh → 130 gCO₂/kWh
Ember observed gCO₂/kWh for the country; IEA STEPS for 2030 / 2050 projection.
P1
Physical climate
Current state + 2030 / 2050 / 2080 horizons (NEX-GDDP, Aqueduct Future, CoastalDEM, UKCP18)
Business as usual
| Indicator | 2030 | 2050 | 2080 |
|---|---|---|---|
| Water stress (0–5) | 5.0 | 5.0 | 5.0 |
| Water depletion (0–5) | 5.0 | 5.0 | 5.0 |
| Interannual variability (0–5) | 4.4 | 4.9 | 5.0 |
| Seasonal variability (0–5) | 1.4 | 1.0 | 1.2 |
Pessimistic
| Indicator | 2030 | 2050 | 2080 |
|---|---|---|---|
| Water stress (0–5) | 5.0 | 5.0 | 5.0 |
| Water depletion (0–5) | 5.0 | 5.0 | 5.0 |
| Interannual variability (0–5) | 4.3 | 4.0 | 4.9 |
| Seasonal variability (0–5) | 1.0 | 1.3 | 1.3 |
P2
Nature dependency
Water (Aqueduct + sector-weighted lens), biodiversity, soil
Water — sector-weighted lens
0.88 Low (office lens)
Watershed: Dubai, United Arab Emirates · aq30 24261
Hydrology context
Major basin: Arabian Peninsula · coastal
Water — Aqueduct baseline indicators
BWS — Water stress
5.00
Extremely High (>80%)
BWD — Depletion
5.00
Extremely High (>75%)
RFR — Riverine flood
4.00
High (6 in 1,000 to 1 in 100)
CFR — Coastal flood
2.13
Medium - High (7 in 100,000 to 3 in 10,000)
DRR — Drought
—
No Data
UDW — Drinking water
0.00
USA — Sanitation
0.00
Biodiversity — protected areas
No protected areas within 30km (currently PAD-US US-only; KBA + national PAs Wave 2 pending).
Soil
SoilGrids / Living England — Wave 3/5 pending
P3
Nature impact
Emissions, fire, deforestation
Fire (FIRMS, last 7 days)
293 fires within 50km · nearest 7 km
Air quality (PM2.5)
22.9µg/m³ · Moderate
From OpenAQ station The Greens · 2.4 km away · measured 5/19/2026
Asset emissions (Climate TRACE, within 50km)
3 assets · 8,288.6 ktCO₂e/yr aggregate
- Jebel Ali aluminium plant — aluminum/ · 2,465.2 ktCO₂e (2024) · 10.7 km
- Emirates Global Aluminum Smelter power station — electricity-generation/ · 4,590.2 ktCO₂e (2024) · 11.5 km
- ENOC Jebel Ali Refinery — oil-and-gas-refining/ · 1,233.2 ktCO₂e (2024) · 15 km
Deforestation (Hansen GFC, 5km buffer)
Loss 2001-2023 within 5km
1.30
hectares
Loss 2019-2023 (recent)
1.30
hectares
Canopy cover (2000 baseline)
0.00
% in 1km
P4
Operational + social
Buildings, grid carbon, workforce
Buildings
Microsoft + Google footprints + EPC — Wave 3 pending
Grid carbon intensity
2023 · now
466
gCO₂/kWh
2030 · STEPS
285
gCO₂/kWh-39%
2050 · STEPS
130
gCO₂/kWh-72%
Country lookup (AE) · Ember 2024 + IEA WEO 2024 STEPS
Workforce
ONS / BLS just-transition — Wave 6 pending
P5
Disclosure-ready outputs
TNFD-LEAP / IFRS-S2 / SBTN / EUDR / BNG / SBTi-FLAG fragments
Applicable frameworks
TCFD, IFRS-S2, CSRD, EU ETS, EU eMARS
wave_5_pending — composed from bakes once P1-P4 populated
Generated 2026-07-07T21:35:18.561Z