Laing O'Rourke Ireland office - 25/28 North Wall Quay, Dublin 1 · Physical exposureFACILITY
Laing O'Rourke Delivery Limited · operating_office · Dublin, IE · 53.349, -6.261
basis:
MEASURED · confidence: 0.65 · status: activeCombined risk & exposure
Radial: current state · Sparklines: 2023 / 30 / 50 / 80Trajectory across horizons
Water stress1.07 → 1.02
Aqueduct 4.0 BWS score at the HydroBASINS L6 watershed containing the site.
Water depletion0.58 → 0.49
Aqueduct 4.0 BWD score — cumulative extraction against replenishment at the same watershed.
Deforestation8 ha cumulative → extrapolated +12 ha
Hansen Global Forest Change tree-cover loss within 5km; forward horizons extrapolated from 2019-2023 loss rate.
Grid carbon256 gCO₂/kWh → 50 gCO₂/kWh
Ember observed gCO₂/kWh for the country; IEA STEPS for 2030 / 2050 projection.
P1
Physical climate
Current state + 2030 / 2050 / 2080 horizons (NEX-GDDP, Aqueduct Future, CoastalDEM, UKCP18)
Business as usual
| Indicator | 2030 | 2050 | 2080 |
|---|---|---|---|
| Water stress (0–5) | 1.1 | 1.0 | 1.0 |
| Water depletion (0–5) | 0.6 | 0.5 | 0.5 |
| Interannual variability (0–5) | 1.3 | 1.4 | 1.4 |
| Seasonal variability (0–5) | 1.7 | 1.7 | 1.8 |
Pessimistic
| Indicator | 2030 | 2050 | 2080 |
|---|---|---|---|
| Water stress (0–5) | 1.1 | 1.3 | 1.5 |
| Water depletion (0–5) | 0.6 | 0.7 | 0.8 |
| Interannual variability (0–5) | 1.4 | 1.3 | 1.3 |
| Seasonal variability (0–5) | 1.7 | 1.8 | 1.9 |
P2
Nature dependency
Water (Aqueduct + sector-weighted lens), biodiversity, soil
Water — sector-weighted lens
0.86 Low (office lens)
Watershed: Dublin, Ireland · aq30 18944
Hydrology context
Major basin: SHANNON · coastal
Water — Aqueduct baseline indicators
BWS — Water stress
1.07
Low - Medium (10-20%)
BWD — Depletion
0.58
Low (<5%)
RFR — Riverine flood
0.86
Low (0 to 1 in 1,000)
CFR — Coastal flood
1.20
Low - Medium (9 in 1,000,000 to 7 in 100,000)
DRR — Drought
2.83
Medium (0.4-0.6)
UDW — Drinking water
0.00
USA — Sanitation
0.00
Biodiversity — protected areas
Nearest: South Dublin Bay and River Tolka Estuary SPA · 2.3 km
Special Protection Area (Birds Directive) · managed · IE · natura_2000
5 PAs within 30km
- South Dublin Bay and River Tolka Estuary SPA — 2.3 km (Special Protection Area (Birds Directive))
- South Dublin Bay SAC — 3.5 km (Site of Community Importance (Habitats Directive))
- North Bull Island SPA — 5.4 km (Special Protection Area (Birds Directive))
- North Dublin Bay SAC — 5.4 km (Site of Community Importance (Habitats Directive))
- Baldoyle Bay SAC — 10.1 km (Site of Community Importance (Habitats Directive))
Soil
SoilGrids / Living England — Wave 3/5 pending
P3
Nature impact
Emissions, fire, deforestation
Fire (FIRMS, last 7 days)
17 fires within 50km · nearest 15.1 km
Air quality (PM2.5)
Nearest station IE0105A (0.5 km) — no recent PM2.5 measurement.
Asset emissions (Climate TRACE, within 50km)
3 assets · 1,116.4 ktCO₂e/yr aggregate
- North Wall power station — electricity-generation/ · 669.1 ktCO₂e (2024) · 3.3 km
- Poolbeg power station — electricity-generation/ · 447.3 ktCO₂e (2024) · 5 km
- Meath power station — electricity-generation/ · 0 ktCO₂e (2024) · 37.5 km
Deforestation (Hansen GFC, 5km buffer)
Loss 2001-2023 within 5km
7.70
hectares
Loss 2019-2023 (recent)
1.10
hectares
Canopy cover (2000 baseline)
0.98
% in 1km
P4
Operational + social
Buildings, grid carbon, workforce
Buildings
Microsoft + Google footprints + EPC — Wave 3 pending
Grid carbon intensity
2025 · now
256.38
gCO₂/kWh
2030 · STEPS
130
gCO₂/kWh-49%
2050 · STEPS
50
gCO₂/kWh-80%
Country lookup (IE) · Ember 2024 + IEA WEO 2024 STEPS
Workforce
ONS / BLS just-transition — Wave 6 pending
P5
Disclosure-ready outputs
TNFD-LEAP / IFRS-S2 / SBTN / EUDR / BNG / SBTi-FLAG fragments
Applicable frameworks
TCFD, IFRS-S2
wave_5_pending — composed from bakes once P1-P4 populated
Generated 2026-07-07T21:35:28.004Z