Skip to content
SME profile

BEEE Creative CIO

United Kingdom·2 headcount·Reporting year 2025

BEEE Creative CIO is a small arts charity across Hertfordshire and Bedfordshire. We connect artists, practitioners and cross-sector partners to optimise opportunities for people to access and enjoy the benefits of dance.

SME Climate Hub directory
SectorCreative arts and entertainment activities
RegionEurope
Reporting statusReported
Partial profile

We haven't fully researched BEEE Creative CIO yet.

Request a full evidence-chained profile — we'll dig into their carbon, nature, social & water disclosure, find their facilities and sources, and email you when it's ready.

We’ll only use your email to notify you about this request.

Commitment

Net zero target
By 2030
Scope 1 + 2 + 3 · Baseline 2025

Practices & perspective

Practices in place
Climate action plan in placenot asked
Scope 3 emissions measured
Engaged suppliers on net-zeronot asked
Communicated commitment to customers
Products/services qualify as climate solutionsnot asked
Integrated climate into company missionnot asked
Third-party verified data
In their own words
. * This is our first year of carbon calculations and will serve as our baseline going forwards.
Acknowledged challenges
  • 01Reducing scope 1+2 emissions
  • 02Reducing scope 3 emissions
  • 03Reducing emissions from business travel
  • 04Electrifying the vehicle fleet and/or cutting transport emissions
  • 05Complexities in managing supply chain emissions
  • 06Time constraints
  • 07Insufficient funding
  • 08Inaccurate or insufficient data

Reported footprint

GHG emissions (tCO2e)
 2025
Scope 12.4
Scope 20.7
Scope 1 + 23.1
Scope 3
Scope 3 not measured
Energy use
 2025unit
Total16.2kkWh
Renewable0.0kWh
Renewable share0.0%

Calculated via: Other calculator (please specify) 3.8.1 Specify any additional details * Julie's Bicycle Climate too

Country grid context · United Kingdom · 2024

Renewables
50%
of generation
Intensity
197
gCO₂/kWh · low

Coal-free since Sep 2024; wind-led grid.

Source: Ember Yearly Electricity Data (CC BY 4.0). For SMEs, the grid carbon intensity is the dominant lever on Scope 2 emissions — switching to a renewable tariff is often the single biggest cut available.

Grid trajectory
Renewables (%)Carbon intensity (gCO₂/kWh)
201520240%100%0500

Renewable transition options· 16 MWh annual load · 0% renewable today

What it would realistically take to move 16 MWh of remaining electricity to renewable sources, given typical SME options + market-specific costs in this country. Numbers are indicative — a real proposal needs a quote from a local installer or supplier.

Switch to certified renewable tariff
Recommended
Most cost-efficient route for the remaining 16 MWh.

Sign with a green-energy supplier (Guarantees of Origin / REGOs backing). No capex; pricing is tied to a small premium over your current standard tariff. Best when paired with on-site reductions to keep total bill manageable.

Annual cost
£81–£405
Effort
low
£5–£25 per MWh premium in GB; ~£81–£405/year for 16 MWh.
On-site rooftop solar (~18 kW)
Possible
Capex investment that covers ~100% of current consumption.

Install a 18 kW rooftop PV system (sized to match annual consumption). Yields ~17 MWh/year in GB — close to total annual use. Net-metering / export tariff supports the payback. Real proposal needs a roof survey + planning check.

Upfront
£16k–£25k
Annual saving
£2.9k–£4.2k
Payback
46 yrs
Effort
high
Sized for an SME roof; 18 kW typically fits 150–250 m² of usable roof.
Aggregated / community PPA
Not feasible
Pool with other small users to access wholesale renewable generation.

Several brokers (e.g. SmartestEnergy, Statkraft, Centrica) now offer aggregator " + "PPAs that pool SMEs to reach the ~5 GWh/year minimum. Typical contract length 5–10 years. Pricing usually below standard tariff; protects against grid-tariff inflation.

Annual cost
£3.3k–£3.8k
Effort
medium
Too small for direct PPA (typical minimum 1 GWh/year, this firm uses ~16 MWh).
Direct corporate PPA
Not feasible
Not feasible at this consumption volume.

Direct PPAs require a buyer to commit to ~5–50 GWh/year over 10+ years. Any SME at <100 MWh annual consumption can't access this market directly. Out of scope for this firm.

Direct PPAs require ≥1 GWh/year; this firm uses ~16 MWh.

Cost ranges are 2025-ish published market data. Premiums + capex move with energy prices and policy. Best approach for most SMEs: certified renewable tariff first (cheap, fast), then on-site solar if roof + capital allow. PPAs need ≥1 GWh/year volume to access directly — aggregators are starting to bridge this for smaller users.

Sector net-zero pathway

Industry-level decarbonisation context — not this firm's own commitment. Shows how the wider sector needs to evolve for individual SME targets to be achievable.

Sector mapping not yet specific — every business depends on the power grid as the universal dependency.

Sector primary pathway

No sector-specific primary pathway in our library yet for this firm. The dependencies below show what their decarbonisation ultimately rests on.

Sector dependencies · 1 upstream sector
Grid carbon intensity
% of 2020 gCO2/kWh
0501002020203020402050
Best0%
Realistic15%
Worst60%
Grid carbon intensity · % of 2020 gCO2/kWh · base 2020
Source: IEA WEO 2023 — NZE / APS / STEPS
IEA WEO 2023

Pathway data is authored estimates anchored on IEA / SBTi sector pathways. Best / Realistic / Worst lines map to NZE / APS / STEPS-style scenarios.