Avalon Plastics Ltd
Injection moulder with 41 injection moulding machines, 109 employees, 24/7 production. On site tooling capabilities
| Sector | Manufacturing - Other |
| Region | Europe |
| Size band | 11-100 employees |
| Joined SME Hub | 22 Jul 2024 |
| Reporting status | Reported |
We haven't fully researched Avalon Plastics Ltd yet.
Request a full evidence-chained profile — we'll dig into their carbon, nature, social & water disclosure, find their facilities and sources, and email you when it's ready.
We’ll only use your email to notify you about this request.
Commitment
Practices & perspective
“. * From 1st October 2025 using 100% renewable energy.”
- 01Reducing scope 3 emissions
- 02Complexities in managing supply chain emissions
- 03Time constraints
- 04Lack of skills and knowledge
- 05Other challenges (please specify) Specify other challenges * Balancing emission reductions with business growth
- 06Complexities in managing supply chain emissions
- 07Slow societal and economic progress on climate action
- 08Insufficient policies or government incentives
- 09Limited influe
Reported footprint
| 2025 | |
|---|---|
| Scope 1 | 2.9 |
| Scope 2 | 327 |
| Scope 1 + 2 | 330 |
| Scope 3 | — |
| 2025 | unit | |
|---|---|---|
| Total | 2.9M | kWh |
| Renewable | 715.5k | kWh |
| Renewable share | 24.3 | % |
Calculated via: Small Business Carbon Calculator
Country grid context · United Kingdom · 2024
Coal-free since Sep 2024; wind-led grid.
Source: Ember Yearly Electricity Data (CC BY 4.0). For SMEs, the grid carbon intensity is the dominant lever on Scope 2 emissions — switching to a renewable tariff is often the single biggest cut available.
Renewable transition options· 2939 MWh annual load · 24% renewable today
What it would realistically take to move 2224 MWh of remaining electricity to renewable sources, given typical SME options + market-specific costs in this country. Numbers are indicative — a real proposal needs a quote from a local installer or supplier.
Sign with a green-energy supplier (Guarantees of Origin / REGOs backing). No capex; pricing is tied to a small premium over your current standard tariff. Best when paired with on-site reductions to keep total bill manageable.
Install a 3095 kW rooftop PV system (sized to match annual consumption). Yields ~2940 MWh/year in GB — close to total annual use. Net-metering / export tariff supports the payback. Real proposal needs a roof survey + planning check.
Several brokers (e.g. SmartestEnergy, Statkraft, Centrica) now offer aggregator " + "PPAs that pool SMEs to reach the ~5 GWh/year minimum. Typical contract length 5–10 years. Pricing usually below standard tariff; protects against grid-tariff inflation.
Direct PPAs require a buyer to commit to ~5–50 GWh/year over 10+ years. Any SME at <100 MWh annual consumption can't access this market directly. Out of scope for this firm.
Cost ranges are 2025-ish published market data. Premiums + capex move with energy prices and policy. Best approach for most SMEs: certified renewable tariff first (cheap, fast), then on-site solar if roof + capital allow. PPAs need ≥1 GWh/year volume to access directly — aggregators are starting to bridge this for smaller users.
Sector net-zero pathway· manufacturing general
Industry-level decarbonisation context — not this firm's own commitment. Shows how the wider sector needs to evolve for individual SME targets to be achievable.
Generic manufacturing leans on power-grid decarbonisation as the dominant Scope 1+2 lever.
Hover the chart to read off Best / Realistic / Worst values at any year. Click to pin the readout.
Best 0% · Worst 70%
Source: IEA WEO 2023 — NZE / APS / STEPS
Pathway data is authored estimates anchored on IEA / SBTi sector pathways. Best / Realistic / Worst lines map to NZE / APS / STEPS-style scenarios.