Skip to content
SME profile

Avalon Plastics Ltd

United Kingdom·90 headcount·Reporting year 2025

Injection moulder with 41 injection moulding machines, 109 employees, 24/7 production. On site tooling capabilities

SME Climate Hub directory
SectorManufacturing - Other
RegionEurope
Size band11-100 employees
Joined SME Hub22 Jul 2024
Reporting statusReported
Partial profile

We haven't fully researched Avalon Plastics Ltd yet.

Request a full evidence-chained profile — we'll dig into their carbon, nature, social & water disclosure, find their facilities and sources, and email you when it's ready.

We’ll only use your email to notify you about this request.

Commitment

Net zero target
By 2050
Scope 1 + 2 + 3 · Baseline 2019

Practices & perspective

Practices in place
Climate action plan in placenot asked
Scope 3 emissions measured
Engaged suppliers on net-zeronot asked
Communicated commitment to customers
Products/services qualify as climate solutionsnot asked
Integrated climate into company missionnot asked
Third-party verified data
Climate risk:Yes - we have identified both climate risks and opportunities 6.2.1 Where are the climate risks you've identified? * Own operations 6.2.2 How are you managing these climate risks? Choose as many as ar
In their own words
. * From 1st October 2025 using 100% renewable energy.
Acknowledged challenges
  • 01Reducing scope 3 emissions
  • 02Complexities in managing supply chain emissions
  • 03Time constraints
  • 04Lack of skills and knowledge
  • 05Other challenges (please specify) Specify other challenges * Balancing emission reductions with business growth
  • 06Complexities in managing supply chain emissions
  • 07Slow societal and economic progress on climate action
  • 08Insufficient policies or government incentives
  • 09Limited influe

Reported footprint

GHG emissions (tCO2e)
 2025
Scope 12.9
Scope 2327
Scope 1 + 2330
Scope 3
Energy use
 2025unit
Total2.9MkWh
Renewable715.5kkWh
Renewable share24.3%

Calculated via: Small Business Carbon Calculator

Country grid context · United Kingdom · 2024

Renewables
50%
of generation
Intensity
197
gCO₂/kWh · low

Coal-free since Sep 2024; wind-led grid.

Source: Ember Yearly Electricity Data (CC BY 4.0). For SMEs, the grid carbon intensity is the dominant lever on Scope 2 emissions — switching to a renewable tariff is often the single biggest cut available.

Grid trajectory
Renewables (%)Carbon intensity (gCO₂/kWh)
201520240%100%0500

Renewable transition options· 2939 MWh annual load · 24% renewable today

What it would realistically take to move 2224 MWh of remaining electricity to renewable sources, given typical SME options + market-specific costs in this country. Numbers are indicative — a real proposal needs a quote from a local installer or supplier.

Switch to certified renewable tariff
Recommended
Most cost-efficient route for the remaining 2224 MWh.

Sign with a green-energy supplier (Guarantees of Origin / REGOs backing). No capex; pricing is tied to a small premium over your current standard tariff. Best when paired with on-site reductions to keep total bill manageable.

Annual cost
£11k–£56k
Effort
low
£5–£25 per MWh premium in GB; ~£11,119–£55,597/year for 2224 MWh.
On-site rooftop solar (~3095 kW)
Not feasible
Capex investment that covers ~100% of current consumption.

Install a 3095 kW rooftop PV system (sized to match annual consumption). Yields ~2940 MWh/year in GB — close to total annual use. Net-metering / export tariff supports the payback. Real proposal needs a roof survey + planning check.

Upfront
£2786k–£4333k
Annual saving
£504k–£720k
Payback
46 yrs
Effort
high
3095 kW exceeds typical SME rooftop area; consider a ground-mount or PPA route.
Aggregated / community PPA
Possible
Pool with other small users to access wholesale renewable generation.

Several brokers (e.g. SmartestEnergy, Statkraft, Centrica) now offer aggregator " + "PPAs that pool SMEs to reach the ~5 GWh/year minimum. Typical contract length 5–10 years. Pricing usually below standard tariff; protects against grid-tariff inflation.

Annual cost
£456k–£523k
Effort
medium
Volume just about supports aggregator pooling.
Direct corporate PPA
Not feasible
Not feasible at this consumption volume.

Direct PPAs require a buyer to commit to ~5–50 GWh/year over 10+ years. Any SME at <100 MWh annual consumption can't access this market directly. Out of scope for this firm.

Direct PPAs require ≥1 GWh/year; this firm uses ~2939 MWh.

Cost ranges are 2025-ish published market data. Premiums + capex move with energy prices and policy. Best approach for most SMEs: certified renewable tariff first (cheap, fast), then on-site solar if roof + capital allow. PPAs need ≥1 GWh/year volume to access directly — aggregators are starting to bridge this for smaller users.

Sector net-zero pathway· manufacturing general

Industry-level decarbonisation context — not this firm's own commitment. Shows how the wider sector needs to evolve for individual SME targets to be achievable.

Generic manufacturing leans on power-grid decarbonisation as the dominant Scope 1+2 lever.

Sector primary pathway
Corporate Scope 1+2 absolute emissions
% of 2020 emissions
0501002020203020402050
Year readout

Hover the chart to read off Best / Realistic / Worst values at any year. Click to pin the readout.

2050 endpoint:
Best 0% · Worst 70%
Corporate Scope 1+2 absolute emissions · % of 2020 emissions · base 2020 · Source: SBTi 1.5°C corporate criteria (4.2% YoY) · Race to Zero · BAU
SBTi 1.5°C corporate criteria (4.2% YoY) · Race to Zero · BAU
Sector dependencies · 1 upstream sector
Grid carbon intensity
% of 2020 gCO2/kWh
0501002020203020402050
Best0%
Realistic15%
Worst60%
Grid carbon intensity · % of 2020 gCO2/kWh · base 2020
Source: IEA WEO 2023 — NZE / APS / STEPS
IEA WEO 2023