Boehringer Ingelheim — full event log
Every event we have on file across every reporting year. The Data-by-year tab summarises the top 10 per year; this page shows them all.
← back to Data by year2023· 13 events
Boehringer Ingelheim states alignment of its sustainability mission with the UN Sustainable Development Goals (specific SDG numbers not disclosed in this document).
sustainability_report p.1
Waste to landfill reduced 62% in absolute terms since 2010 baseline. Shanghai (2021), Sant Cugat (2023) and Dortmund (2023) achieved Zero Waste to Landfill certification. 2023 waste split: 59% recycled/reused, 23% waste-to-energy, 6% landfill, 10% incineration without heat recovery.
sustainability_report p.1
In 2023 Boehringer Ingelheim's greenhouse gas emission reduction targets (Scope 1, 2 and 3) were validated and approved by the Science Based Target initiative (SBTi).
sustainability_report p.1
By 2023, over 70% of worldwide electricity was renewable, achieved through transitions at various sites and the launch of a 1.2 MW solar plant at corporate headquarters in Ingelheim. A new biomass power plant is set to begin operations at headquarters in 2024. On-site renewable generation is being expanded, e.g. solar panels at the Shanghai production site.
sustainability_report p.1
Boehringer has made it mandatory to apply green chemistry and eco-design principles to all new products, addressing emissions and environmental impact embedded in product design and the upstream value chain.
sustainability_report p.1
By 2030, aim to be carbon neutral in business operations (Scope 1 and 2), cut resource footprint by half across the value chain.
sustainability_report p.1
Since 2019, Boehringer has increased climate contributions beyond its value chain to 15 carbon reduction projects in 11 countries worldwide, in partnership with ClimateSeed — more than 230,000 tCO2e captured or avoided. Projects cover reforestation, biodiversity and clean energy and add social value in communities in Canada, China, Malawi and Peru. The firm does not separate durable removals from avoidance credits.
sustainability_report p.1
In 2021 Shanghai production site achieved Zero Waste to Landfill certification, followed in 2023 by Sant Cugat (Spain) and Dortmund (Germany).
sustainability_report p.1
Decarbonisation of operations through on-site solar (1.2 MW at Ingelheim HQ, additional panels at Shanghai) and a new biomass power plant at Ingelheim starting operations in 2024. Eight sites are now carbon-neutral certified.
sustainability_report p.1
Aim to implement Alliance for Water Stewardship certification at all sites affected by water scarcity. Production sites in Fremont (USA) and Promeco (Mexico) are AWS certified.
sustainability_report p.1
Implementation of Alliance for Water Stewardship (AWS) certification at all sites affected by water scarcity, with Fremont (USA) and Promeco (Mexico) certified. Water consumption held flat (6.2 million m³ in 2023 vs 6.3 in 2019) despite increasing production. 'Clean Water Initiative' keeps pharmaceutical traces in production wastewater below effect level.
sustainability_report p.1
Eight of Boehringer Ingelheim sites worldwide have been certified as carbon-neutral.
sustainability_report p.1
An internal carbon price of EUR 100 per ton CO2 is applied to investment decisions to foster low-carbon technologies and solutions. This is reinforced by the MORE GREEN Fund (EUR 130 million) which has supported over 65 CapEx projects since 2020, focused on decarbonization, circular economy, water management and biodiversity.
sustainability_report p.1